BUILDING AND CONSTRUCTION MATERIAL MANUFACTURERS

Pricing Building Materials When Freight Decides the Order

A contractor rings at six in the evening asking for a delivered rate to a site forty kilometres away, including unloading by hand. You quote the ex-factory price, he gets a delivered price from a rival, and the order is gone before you finish your tea.

We help the owner build the pricing and credit routines behind that call: delivered cost by route, dealer limits, plant loading across the year. We do not advise on product standards, mix design or structural use. Testing labs and engineers decide those.

Discuss your priorities ↗

COMMON CHALLENGES

The pressures
we often see.

OUR FOCUS AREAS

Where the work
usually starts.

START THIS WEEK

Things you can do
before you call anyone.

  1. Take your five most frequent delivery routes and work out the true cost of reaching each: truck, fuel share, loading, unloading and an allowance for breakage. Compare it to what you charged on the last order.
  2. Hypothetical example: ex-works price is ₹6 a block, freight and unloading come to ₹1.20, and breakage costs 8 paise. A delivered quote of ₹7 leaves very little margin, so the salesman should know the floor before he speaks.
  3. List every dealer owing you more than the amount of one month of their purchases. Call the largest and agree a payment date in writing.
  4. Start a simple dispatch slip with quantity, vehicle number and condition signed by the driver. Review it after the first month of use.

A PRACTICAL ENGAGEMENT

Start with the priorities
that matter most.

We begin by understanding how your business runs today, find the gaps, and agree the scope in writing. Recommendations are shaped around your team, your resources and your goals.

  • A route-wise delivered-cost sheet the salesperson can read from a phone
  • A dealer credit policy on one page, with limits, grace days and the escalation step
  • A seasonal plant loading and stock plan marked with the slow and busy months
  • A dispatch and breakage record format agreed with transporters

Not the right fit when: If a product failure or a customer dispute over quality is the pressing issue, an engineer or lawyer should look at it first; pricing work can wait until that is settled.

Explore a business audit ↗

LET’S MOVE YOUR BUSINESS FORWARD

Quote delivered rates that still leave your plant a margin

Book a business consultation ↗