THE PROBLEM TO INVESTIGATE
Find where information or ownership breaks down
For the shop owner, estimator and production planner when accepted jobs repeatedly need clarification or rescheduling.
Possible cause
A delivery date may have been promised using run time while omitting setup or inspection availability.
Evidence to check
Compare quote assumptions with setup logs, the production schedule and inspection waiting records for comparable jobs.
Possible cause
A drawing revision or change in material responsibility may not have reached the person scheduling the job.
Evidence to check
Trace the accepted revision, change approval and handoff record for a recently amended order.
These are hypotheses to investigate with you, not a diagnosis of your business.
OUR APPROACH
Make the handoffs and exception rules explicit
Walk through the work
- Receive the RFQ, drawing revision, quantity and requested date; record missing commercial inputs before quoting.
- Separate setup, programming, tooling, inspection and run-time assumptions in the quote, with technical estimates supplied by the responsible specialists.
- After acceptance, confirm material responsibility, machine capacity and any outside-process dependency before releasing the job.
- Record progress and waiting reasons against the job, then confirm the required inspection and dispatch records before administrative completion.
Compare the operating choices
Introduce an order-release checklist.
Adds a deliberate confirmation step before release but can expose missing material, revision or capacity information while there is still time to respond.
Set exception authority for repeat parts.
Can shorten routine release when the approved assumptions remain valid; changed quantities, revisions or tooling needs must return to the responsible reviewer.
Test a difficult case
Walk through a missing input, a changed commitment and incomplete work. Record who can approve the exception and who receives the updated instruction.
WHAT YOU RECEIVE
Outputs to agree in the scope
- An order-release checklist covering revision, material responsibility and confirmed capacity.
- A handoff map naming the receiving role, required information and exception owner.
- A pilot log covering a routine order and a changed order, with agreed completion checks.
WHAT TO PREPARE
Bring the evidence you have
- Anonymised routine, delayed and amended job records with accepted dates.
- Quote assumptions, planning records and inspection waiting logs supplied by the responsible team.
We agree the sample, access and preparation needed before starting.
HYPOTHETICAL EXAMPLE
A situation to work through
The situation
A repeat-part order is accepted at last time’s delivery interval. The new lot is smaller, but the same fixture setup and inspection work are still required.
What to examine
The supervisor and estimator compare the accepted quantity, setup allowance and inspection availability. They check whether the promise assumed that a smaller lot always finishes proportionately sooner.
The management decision
Management decides which order changes require renewed capacity confirmation and names the person authorised to revise the customer commitment. Programming, tolerances and inspection approval remain with qualified technical staff.
MEASUREMENT
Agree definitions before setting targets
- Orders released with complete commercial inputs
Released jobs with confirmed drawing revision, material responsibility and delivery commitment divided by jobs released in the sample.
Review: Weekly during the pilot- Waiting time by job stage
Record waiting for material, fixture, machine or inspection separately from cutting and setup time; compare equivalent job types.
Review: At the daily production review
Agree the starting period, record owner and review cadence. Targets depend on the baseline; these are not promised results.
CLIENT OWNERSHIP
What management must do
- The owner approves commercial escalation limits; the planner owns the release checklist.
- The estimator and supervisor test the handoff on an agreed job sample, including a changed order.
- The process owner records exceptions, updates the instruction and agrees when the old release routine ends.
ACCEPTANCE AND HANDOVER
Agree when the work is complete
- The workflow names a trigger, required inputs and an end condition.
- Each handoff and exception has an accountable role.
- A user walkthrough confirms that the agreed SOP can be followed.
Engagement and support
A defined workflow design and documentation project, with a pilot where agreed.
The written scope confirms outputs, preparation, timing, fees and the support included. Your team retains the decisions and implementation responsibilities described above.
Scope boundaries
Programming, machining parameters, tolerances and inspection approval remain with qualified technical staff. This review does not certify product quality or install scheduling software.
Before you get in touch
What will our team receive?
An order-release checklist covering revision, material responsibility and confirmed capacity. A handoff map naming the receiving role, required information and exception owner. A pilot log covering a routine order and a changed order, with agreed completion checks.
Which records should we bring to the first discussion?
Anonymised routine, delayed and amended job records with accepted dates. Quote assumptions, planning records and inspection waiting logs supplied by the responsible team.
What determines the scope, fee and timeline?
The number of locations, people, workflows and records involved, the quality of available information and the depth of implementation support. For this engagement, we begin by agreeing a current and proposed order-to-delivery workflow. These details are agreed in writing before work starts.
What if our records are incomplete?
Bring the records you have and examples of the work. We identify missing information, distinguish estimates from verified facts and agree a manageable starting scope. We do not present incomplete information as a confirmed finding.
Does the engagement include implementation?
The written scope specifies the documents, review meetings, training or pilot support included. A review or plan does not automatically include running the operation, software development or ongoing execution.
Start with the decision you need to make.
Tell us about your business, the issue and the people involved. We will use the first conversation to agree the problem and the next useful step.
Discuss your requirements