Measure the real time each step takes

Take the last twenty completed orders. For each, note the date of each step: order confirmed, materials ready, work started, work finished, dispatched, delivered.

Use the slower recent orders, not the best ones. A promise based on the fastest job will fail whenever anything ordinary goes wrong.

Check the queue before you promise

A new order joins a line. The date depends on what is ahead of it at the step that is always busiest.

Keep a simple board of promised dates for that step. Sales checks the board before speaking to the customer. If the board is full for the week, the earliest honest date is next week.

  • Name the busiest step: a machine, a team, a vehicle or a doctor's slots
  • Show promised work against it, by day or week
  • Let only one person add an order to the board
  • Update it daily, before sales calls start

Confirm materials and approvals are in hand

An order waiting on raw material or a customer's drawing approval has not started. Count the date from when those arrive, not from the order date.

Hypothetical example: a furniture maker promises a date before the customer has approved the finish sample. An optical shop promises spectacles before the lab has confirmed the lens is in stock. In both, the date was lost before work began.

Give a date with its conditions attached

Say the date and what it depends on. 'Dispatch on the 18th, provided we have your approved drawing by the 10th' gives the customer a part in keeping the promise.

Write the conditions on the order confirmation. When a condition is missed, the date moves by the same gap, and the customer has already seen why.

Tell the customer early when a date will slip

Set a check point halfway to the promised date. If the order is behind, call the customer then, with a new date and the reason.

An early call gives the customer time to plan around it. A call on the day leaves them stranded and remembering it.

Track promised dates against actual dates each month. The gap tells you whether the method needs a larger allowance at one step.

Delivery date check (hypothetical fabricator, illustrative figures)

StepRecent slower timeWhat to check before promisingWho checks
Drawing approval from customer4 working daysIs the approved drawing in hand?Sales
Material arrival6 working daysIs the steel in stock or on a confirmed order?Purchase
Cutting and welding5 working daysWhat is already booked on the welding bay?Production head
Painting and dispatch3 working daysIs a vehicle booked for the week?Dispatch head

Illustrative figures. Use the slower times from your own last twenty orders and add the waiting time at the busiest step.

Lines for sales and the operations head

  • Sales to production: 'Before I give the customer a date, what is booked on the busiest step that week?'
  • To the customer: 'We can dispatch on the 18th if the approved drawing reaches us by the 10th.'
  • Early warning: 'Your order is running two days behind because a material lot failed inspection. The new date is the 20th.'
  • When pushed for an earlier date: 'I would rather give you a date we keep than one we miss.'
  • At the monthly review: 'Where did promised and actual dates drift apart, and at which step?'
Your next step

Pull your last twenty completed orders this week and note the date each step finished. Find the step where orders waited longest and start a simple board for it before the next sales call. To see the whole flow from order to delivery, read You know orders are slow, but not where they wait.