Count orders by half hour for two ordinary weeks
Pull order times from the billing system or the app tablet, and add covers for dine-in. Group them by half hour and by day of the week. Leave out festival days and special events, which need their own plan.
Put the count on one sheet beside the staff present in each half hour. The mismatch shows itself without any argument.
Find the station that jams first
Peak trouble starts at one station and spreads. Stand at the pass during a rush and note where tickets wait: the tandoor, the fryer, the packing table or the cash counter. Ask the staff at each station what slows them.
Fix the first jam before adding people elsewhere. A second waiter does nothing for a queue at the tandoor.
Move prep and cleaning out of the rush
List every task done during peak that could be done earlier: cutting, marinating, portioning sauces, folding boxes, restocking cutlery. Move each one into the quiet afternoon, and give it an owner and a finish time.
Keep a prep list on the wall for each service. The quiet hours then carry real work, and the rush carries only cooking and serving.
Shape shifts around the count
Compare rostered hours with the half-hour count. A staggered start, where some staff arrive later and stay through dinner, fits a late peak better than one shift for all. Split shifts suit some teams and exhaust others, so ask before imposing one.
Confirm daily hours, rest breaks and overtime rules with your chartered accountant or lawyer before changing shifts. Write the new rota and share it at least a week ahead.
Give each person a peak-hour role card
During the rush, everyone should know their one job and the one job they cover if a colleague is stuck. Write both on a small card at each station. Cross-train at least two people for the station that jams first.
A hypothetical banquet kitchen catering a company dinner plans the same way. Agree the guest count and serving time with the client in writing, then build the rota backwards from the serving time.
- Tandoor: main job, plus who steps in when tickets pass a set number
- Packing table: checklist owner for every app order
- Floor: tables per waiter and who takes the door
- Cash counter: billing only, with packing moved to another person
Half-hour demand and staff count, Friday dinner (hypothetical)
| Half hour | Dine-in covers | App orders | Kitchen staff | Floor staff | Action |
|---|---|---|---|---|---|
| 6:30 to 7:00 | 12 | 4 | 4 | 3 | Prep must be complete by 6:30 |
| 7:30 to 8:00 | 38 | 14 | 4 | 3 | Add one cook on a staggered start |
| 8:00 to 8:30 | 44 | 18 | 4 | 3 | Move packing off the cash counter |
| 9:30 to 10:00 | 16 | 9 | 4 | 3 | Release one floor staff member to closing tasks |
Illustrative figures. Use two ordinary weeks of your own order times and the staff who were actually present.
Questions for the staff huddle
- "At the worst point last Friday, where did tickets wait the longest?"
- "Which job do you do during the rush that could be done at four o'clock?"
- "If you start an hour later and stay through closing, does that work for you?"
- "Who else can run the tandoor for twenty minutes if needed?"
- To a company client: "Can you confirm the guest count and the exact serving time in writing by Monday?"
This week, pull two ordinary weeks of order times and put them beside the staff present in each half hour. Stand at the pass for one rush and note the station that jams first. Handing peak-hour roles to the team is easier with You handed the task over, and it came back half done.
Is this your problem? The signs and causes are on our page The same job gets done three ways, depending on who is on duty.. This guide is the method.
