Why a count at dispatch hides the cause

At dispatch, parts from different machines, shifts and material lots sit in the same crate. A rejection found there carries no trace of where it was made. Sorting also costs extra handling right before the truck leaves.

A count at the machine is taken within minutes of the defect. The operator knows the material lot, the tool and what changed in the last hour. That knowledge is gone by evening.

Put a red bin and a tally sheet at each machine

Give each key machine a red bin for rejected parts and a tally sheet with the defect types across the top. The operator ticks a box for each piece dropped in the bin. At shift end, the supervisor counts the bin against the ticks.

Keep rework apart. A part that is reworked and passed is still a cost, so give it its own column. Parts accepted on a customer's concession get a third column.

Name the defects once, with a photograph

Two operators will call the same fault by different names unless you fix the list. Agree five to eight defect names with the quality person and attach a photo of each to the sheet.

A hypothetical auto component maker supplying a larger assembler might list burr, undersize, dent, rust and wrong thread. A hypothetical furniture workshop selling to households might list scratch, gap at joint, uneven polish and wrong size. The names differ; the method is the same.

Compare three gates: machine, dispatch and customer

Once the machine count runs, keep counting at dispatch and record customer returns. Put the three numbers side by side each week for the same products.

If dispatch finds defects the machine tally missed, inspection at the machine is weak or the defect list is incomplete. If the customer finds what dispatch missed, look at final inspection. Each gap points to a specific check to tighten.

  • Machine count higher, dispatch and customer low: the first check is working
  • Dispatch higher than machine: operators are missing defects or not recording them
  • Customer higher than dispatch: final inspection is the weak gate

Read the sheet at shift handover

The outgoing supervisor reads out the day's top defect by machine to the incoming supervisor. Two minutes is enough. The incoming shift then knows what to watch before the first piece.

Once a week, the production head picks the largest defect and asks why it happened, with the operator present. Write the action, the owner and the date it will be checked.

Shift reject tally (hypothetical rows)

MachineShiftGood partsRejectedTop defectReworked and passedMaterial lotSigned by
CNC 3Day82014Undersize6L-2211Supervisor A
CNC 3Night76031Undersize4L-2211Supervisor B
Press 1Day1,4509Burr12L-2208Supervisor A
Press 1Night1,38011Dent3L-2208Supervisor B

Illustrative figures. In this example the night shift on CNC 3 rejects twice as many undersize parts on the same lot, which points to setup or tool wear rather than material.

What to say at the machine

  • Every rejected piece goes in the red bin and gets a tick. Nobody is in trouble for a high count.
  • Which defect did you see first today, and what changed just before it?
  • At handover: the top defect on CNC 3 was undersize. Please check the tool before the first piece.
  • To dispatch: when you find a bad part, note the machine marking or batch label if there is one.
  • To the quality person: which defect on our list is missing a clear photo?
Your next step

This week, put a red bin and a tally sheet on one machine with a known defect problem and run it for every shift. At the end of the week, compare its count with what dispatch found for the same product. For a wider view of the numbers worth reading each week, see Margins thin and collections slow for months before anyone noticed, because no single page showed it.

Is this your problem? The signs and causes are on our page The same job gets done three ways, depending on who is on duty.. This guide is the method.